We are your HVAC rental specialists for planned outages and emergencies. That's right, we have your back 24/7. 

Whether it’s extra cooling needed during extreme weather conditions or a short-term replacement following an emergency, businesses sometimes require equipment to cool, heat, or power an indoor environment on a temporary basis.

Fast, Reliable, and Cost-Effective Solutions When You Need Them

Our team of HVAC rental specialists is ready to serve you 24/7. 

Turn-key, full-service mechanical solutions provider

Available fleet covering almost any circumstance.

Minimize risk of the unexpected with a contingency plan

Assist with planned outages or emergency, unplanned shutdowns

CONTINGENCY PLANNING

With a contingency plan, you gain control and peace of mind knowing that your facility can withstand any disaster. Your power needs, heating, and air conditioning will be back up and running quickly. 

WHY RENT?

Whether it’s extra cooling needed during extreme weather conditions or a short-term replacement following an emergency, businesses sometimes require equipment to cool, heat, or power an indoor environment temporarily. We deliver fast, reliable, and cost-effective solutions when you need them.​

Fill out the form below or call (800) 552-6526.

SUCCESS STORY

Vertical: K-12 Schools

Berkeley County Judicial Center.jpg

Challenge: Atholton Elementary School experienced a chiller failure on the second day of the school year. After the school alerted Boland's Rental Services team that their building was extremely hot, an experienced Service Technician concluded that the current chiller was unfixable after assessing the situation on-site. 

Solution: The Rental Services team swiftly sourced a temporary 125-ton Air-Cooled Chiller unit and delivered the piece of equipment only a few hours later. The equipment was installed and started up around 11:30 pm that same night, giving the school a comfortable indoor environment before students and staff reported the following morning.

Results: Atholton Elementary school was able to open as scheduled the following day. The temporary chiller was removed in the fall when the school switched over to heating, and the Rental Service team will be back in the spring to re-install a temporary chiller once air conditioning is needed.

READ MORE