RENTAL SERVICES

Whether it’s extra cooling needed during extreme weather conditions or a short-term replacement following an emergency, businesses sometimes require equipment to cool, heat, or power an indoor environment on a temporary basis.

Fast, Reliable Rental Solutions When You Need Them

We can assist with planned shutdowns and maintenance or last-minute emergency outages. Our extensive rental fleet can accommodate nearly any situation, and our team of HVAC rental specialists is available 24/7, including weekends and holidays. Our fleet includes:

 Air Cooled Chillers

Water Cooled Chillers

Cooling Towers

Air Handling Units

Portable Air Conditioning

Dehumidifiers

Heat Exchangers

Electric and Indirect Fire Heaters

Steam and Hot Water Boilers

Diesel Generators

Our Fleet

Rental Support

Boland Rental Services serves Washington, DC Metro, Northern Virginia, Frederick County, and Western, MD as well as the panhandle of West Virginia markets, including:

Rental Support

Contingency Planning

Whether an outage is induced by a natural disaster, facility distress, or equipment failure, having a contingency plan for your HVAC processes is indispensable. Only through thorough emergency preparedness will you properly assess your risk and have the correct backup systems and strategies to activate immediately.
​
When you work with Boland, our team of mechanical engineers, energy engineers, controls experts, water technologies experts, and our 150+ commercial HVAC technicians will be in your corner.

Contingency Planning

Success Story

atholton-elementary-fall-fundraiser.jpeg

Vertical: K-12 Schools

Challenge: Atholton Elementary School experienced a chiller failure on the second day of the school year. After the school alerted Boland, an experienced Service Technician concluded that the current chiller was unfixable. 

Solution: The Rental Services team swiftly sourced a temporary 125-ton Air-Cooled Chiller unit and delivered the equipment only a few hours later. The equipment was installed and started up around 11:30 pm that same night, giving the school a comfortable indoor environment before students and staff arrived the following morning.

Results: The elementary school was able to open as scheduled the following day. The temporary chiller was removed in the fall when the school switched to heating, and the Rental Services team installed a temporary chiller in the spring. 