Search

Case Study: Large Mixed-Use Office Complex

Updated: Mar 1, 2021


Large Mixed-Use Office Complex

Arlington, VA


CHALLENGE

Our client’s large mixed-use office building complex in Arlington, VA utilizes centralized power and chilled water generation equipment that distributes electricity and chilled water throughout multiple buildings. Their engineering staff was tasked with physically walking around the complex to manually record readings from 50 Electric Meters, 3 Gas Meters, 20 Water Meters, as well as 10 BTU Meters from the Building Automation System (BAS), making it clear that they needed a more effective reporting solution.


The client’s goal was to improve staff productivity, meter reading accuracy, visibility, and the level of detail available for real-time energy usage in each building. Additionally, our client wanted to achieve an Energy Star score of 75 for all buildings.


SOLUTION

To meet the challenges described above, Boland engineered and implemented the following solution:

  • Expanded existing BAS to monitor in real-time by installing 68 Electric Meters, 7 Gas Meters, 18 Water Meters, and 14 BTU Meters

  • Installed BTU and Electrical Submeters to enable true energy usage measurement